Intersection of Spring Boulevard & 12nd Avenue NE – Looking North-East, Rendering Credit: Wright Runstad & Company
A determination of non-significance was issued to Wright Runstad & Company, who proposed to construct an office building with retail and parking. The decision included Design Review, Variance, and SEPA Determination. The site is located in The Spring District at 1615 123rd Avenue Northeast.
The project proposed at The Spring District Block 5 is an 11-story office building over six levels of below grade parking and bicycle storage for up to 150 bicycles. The structure contains 530,742 square feet in gross floor area. About 3,839 square feet of ground floor retail and
→ Continue reading at Downtown Bellevue