Tuesday, January 12, 2021

Amazon’s Office Tower, Bellevue 600, Gets Design Review Approval

Must Read

House seeks Trump removal as it heads to 25th amendment showdown vote – live updates

<!--><!--><!--><!--> Key events Show 7.41am EST07:41 Deutsche Bank severs ties with Donald Trump – reports 7.11am EST07:11 US officials ramp up security plans before Biden...

'The most honest person I ever met': Chadwick Boseman's widow pays tribute at Gotham film awards

The first significant awards event of the current film cycle spread its net wide, but the main attention of...

Agnieszka Holland’s Oscar Entry ‘Charlatan’ Acquired By AX1 in U.K. and Ireland (EXCLUSIVE)

Agnieszka Holland’s “Charlatan,” the Czech Republic’s official entry in the International Feature Film category of the 93rd Academy Awards,...

Amazon Future Office Tower, Bellevue 600 – Rendering Credit: NBBJ

Approval for both the Master Development Plan and Design Review for Phase 1 of Amazon’s Bellevue 600 was recently issued, according to the City of Bellevue. The review included additional accompanying renderings of the project (see below).

Phase 1 includes a 43-story office tower over six below-grade parking levels with 992 parking stalls, totaling 1,140,035 gross square feet. Other improvements include outdoor plaza space, a major public open space, two through block pedestrian connections, landscaping, lighting, and construction of a 30-foot wide section of the Major Pedestrian Corridor.

The first phase of Bellevue 600 will feature a new office tower, meeting center, common space, retail uses, and potential daycare facility.

The site is located on the east half of the Bellevue Corporate Plaza property. There will be room for an estimated 4,200 employees within the 600-foot tower. The building is slated to be the tallest in Bellevue.

Amazon purchased Bellevue Corporate Plaza in April 2019 for $194.9 million. The 3.5-acre development site was the first purchase that Amazon made on the Eastside.

The completion date for Bellevue 600, as well as building occupancy, is estimated to be in 2024.

Amazon Future Office Tower, Bellevue 600Phase 1 of Bellevue 600, Rendering Credit: NBBJ Ground Level Amazon Future Office Tower, Bellevue 600Through Block Pedestrian Connection, Rendering Credit: NBBJ Ground Level Amazon Future Office Tower, Bellevue 600Through Block Connection and Plaza, Rendering Credit: NBBJ

This post was originally published on Downtown Bellevue

- Advertisement -
Bellevue
mist
47.2 ° F
49 °
45 °
100 %
1.6mph
90 %
Tue
53 °
Wed
55 °
Thu
48 °
Fri
49 °
Sat
48 °
- Advertisement -

Latest News

House seeks Trump removal as it heads to 25th amendment showdown vote – live updates

<!--><!--><!--><!--> Key events Show 7.41am EST07:41 Deutsche Bank severs ties with Donald Trump – reports 7.11am EST07:11 US officials ramp up security plans before Biden...

'The most honest person I ever met': Chadwick Boseman's widow pays tribute at Gotham film awards

The first significant awards event of the current film cycle spread its net wide, but the main attention of the 2021 Gotham awards, designed...

Agnieszka Holland’s Oscar Entry ‘Charlatan’ Acquired By AX1 in U.K. and Ireland (EXCLUSIVE)

Agnieszka Holland’s “Charlatan,” the Czech Republic’s official entry in the International Feature Film category of the 93rd Academy Awards, has been acquired for distribution...

‘La Civil,’ With Dardenne Brothers, Cristian Mungiu, Michel Franco on Board, to Be Sold By UDI (EXCLUSIVE)

Frédéric Corvez’s Urban Distribution International, which is taking part in this week’s 23rd Rendez-vous With French Cinema international film market, is launching world sales...

Indian Films Are Actively Contesting the Oscars Short Film Category

Three Indian films, featuring eclectic subject matter, are making bids to snag Oscars in the shorts categories at the 2021 Academy Awards. Keith Gomes’ “Shameless”...
- Advertisement -

More Articles Like This